Construction

Wedging in the new sleep stuff.

Removing with a heavy heart.

Moving air back.

Putting the cold in the right place.

A simpler toilet.

And then you fix them.

360° view from inside.

Outfitting & tweaking.

Getting close...

MARCHing on...

Catching up...

The last electrical push.

Wiring everything up.

Making electrical progress.

John and Callie back to wire things up.

Figuring out the back wall.

Mass loaded vinyl + subfloor install (and a bunch of other small things)!

Kilmat + Polyiso install!

Solar Panel Install!

And so it begins!